The contract of the Marmara University Recep Tayyip Erdoğan Complex 2nd Stage Construction and Infrastructure and Landscaping work was signed by Pekerler İnş. Enj. Taş. Turz. San. and Tic Ltd. Şti. & MBD İnş. San. and Tic. A.Ş. joint work started and signed on 09.05.2022.

The contract of Abdi İPEKÇİ Sports Complex Construction and Infrastructure and Landscaping Construction work was signed by Pekerler İnş. Enj. Taş. Turz. San. and Tic Ltd. Şti. & MBD İnş. San. and Tic. A.Ş. It was joint work started and signed on 16.12.2021.

The subcontractor contract of Antalya 1000 Bed City Hospital (State Hospital) Construction work was signed on 29.04.2021.

The subcontractor contract of Antalya 1000 Bed City Hospital (State Hospital) Construction work was signed on 29.04.2021.

Marmara University Recep Tayyip Erdoğan Social Complex Engineering And Technology Faculties Construction Work, The site was delivered on 04.11.2019 and the works started.

Tokat Erbaa Hospital was accepted and opened to service

Tokat Erbaa Hospital was accepted and opened to service

2.2 Billion Projects from Peker to İzmir

2.2 Billion Projects from Peker to İzmir

Final Acceptance of Antalya Muratpaşa Training and Research Hospital was made.

İzmir Karşıyaka 400-Bed District Education and Research Hospital

Kırıkkale University Faculty of Denistry Building Construction Work Final Acceptance has been made.

Ordu province fatsa district 300-bed state hospital construction work final acceptance has been made

Our Headquarters Office Unit Has Moved.

Our New Address : İlkbahar Mahallesi 596. Sokak No: 71 06550 Çankaya /Ankara Olarak Değişmiştir.